• RFQ/QN 25-BAC-AMP-062 AUGUST 2025 / Supply, Delivery, and Installation of the Re-Insulation of Refrigerant Pipes in Air-Cooled Condensing Unit (ACCU-4) – Whole System/
    Date Posted: 11 August 2025
    Deadline of Submission: 20 August 2025, 5:00 P.M.
    download file